CreBuild Sizing
Sizing is committed on base-case estimates, and conditions keep evolving. CreBuild Sizing analyses competing configurations against varied scenarios before capex is committed.
What to build, and how it will perform.
A hypothetical bid, sized end to end.
The film uses a hypothetical case. All figures in it are illustrative.
A base case alone is a thin basis for a capex-heavy hybrid.
Capacity is fixed early, while inputs are still estimates. A mix chosen on the base case can turn out second best.
Changes keep coming
Sites slip, prices move, estimates shift. Each change ripples through the sizing.
Options multiply
Trackers, DC overloading, degradation, augmentation. Worked by hand, answers go stale.
The base case can mislead
The mix that looks best on the base case can fall behind once inputs move.
Four steps, one model.
Define
Set up the model once: sites, storage, offtake contracts and markets.
Optimise
Search capacity ranges within your limits, with the battery dispatch method of your choice.
Analyse
Scenarios, sensitivity and risk, all in one model.
Report
Customisable reports for each analysis or the whole study.
Evidence behind the sizing decision.
Room to manoeuvre
How far each site’s size can move before returns drop, not just one best answer.
Cases, not spreadsheet copies
Every scenario in one model. Each new question is a re-run, not a rebuild.
Know when to re-size
Which input changes shift the best mix, and which have negligible impact.
Reports that follow the question
Each report is built around the questions your team is asking, in the order they ask them.
Auditable inputs
History, source and dependencies for every input, plus model snapshots.
Judge it on one project or bid.
Share a project or bid
We set up one of your live or mock projects or bids and run it beside your current tool.
Compare
Review the dispatch, the sizing and the turnaround time.
Decide
Every case in one model, changes answered without starting over, and evidence behind the choice.
NITCHAKRA